Skip to content

AI in the analysis and cost estimation of construction tenders – how a UK-based company reduced analysis time from 2 days to 5 minutes

The designed system enables the client to automatically manage energy in real time, based on accurate forecasts of production and consumption. The solution supports the optimization of costs, energy usage, or CO₂ emissions depending on the selected objective.

How a Single Augmented Reality Deployment Helped Avoid the Costs of an International Engineering Team

By implementing the AR Remote Support module based on the nsFlow platform and RealWear smart glasses, the client was able to launch a new production line without the need for engineers to be physically present. The solution helped reduce travel costs and downtime while improving precision and safety on the shop floor.